So much of what you can find online about architecture relates to the finished appearance of a building, but architects on the job need to know how to develop the design intent and document and convey that intent to bidders and builders. This blog is intended to prompt constructive discussion about the architectural processes of making buildings through making drawings and specifications for builders to follow and through administering contracts for construction.
School Construction Photo
A job site photo of a school under construction
A FEW WORDS OF CAUTION
A FEW WORDS OF CAUTION ABOUT THE CONTENT ON THIS SITE:
The content provided on this site and in the Posts is intended to be thought-provoking, educational, and - in some cases - entertaining. It is not intended as direction or recommendations for the design or construction of any specific building project. The information is provided in good faith but without assurance as to its completeness, accuracy, or suitability for any particular purpose. If you are considering using information provided on this site, you are responsible for verifying its appropriateness to your needs, and you assume all risk for its use.
The content provided on this site and in the Posts is intended to be thought-provoking, educational, and - in some cases - entertaining. It is not intended as direction or recommendations for the design or construction of any specific building project. The information is provided in good faith but without assurance as to its completeness, accuracy, or suitability for any particular purpose. If you are considering using information provided on this site, you are responsible for verifying its appropriateness to your needs, and you assume all risk for its use.
Monday, March 23, 2009
This Change Order costs more than my whole house!
Change orders on large projects can carry shocking price tags. A little detail change can be multiplied by thousands of lineal feet or occur hundreds or thousands of times. When I was first working as an architectural drafter in a large architecture and engineering firm (A-E firm), a senior project manager in the firm told me to pay attention to the detail conditions that go for miles, because changes in those details during construction can cost a lot. We were working on highrise office buildings at the time, so a change in a window detail could literally go for miles, considering the perimeter length per floor and the number of floors. It really hit home when I saw a change order that cost more than my whole house. On a large project that can also happen with an additional coat of paint.